⚠The PNB mailbox has used 133% of what Google lets it send in 24 hours (663 of 500 people written to). Put every file of a case in one mail and copy fewer people — or Google stops it.
SUNIL RAMDAS SANAP
File on IGRMails & papers 5 1 draft to send
Correct a detail
Payment seen with your own eyes
A note for the history
Kind of case — the amount follows it
Who paid the challan
Papers
Out of turn
A step done before the case asked for it. The paper is kept and read, the bank mail written and held for Send; a stop on the case still wants its answer.
Advanced — move the case by hand (ask Abhijit first)
Mail in
27 Aug, 11:21
Documents
Payment
Challan
done 7 Sep, 10:54 · GRAS ↗
Filing
in the tray 36d 10h · IGR e-filing ↗
E-filing copy
the token to the branch
Index II
the government, then the branch
our moveChallan paid · the trail says: The NOI team has received the initial documents and payment, and has provided the challan. The case is currently waiting for the branch to provide the colour…whole case so far 47d 10h
Needs your eyes1
The work is done — our fee of ₹22,800 is still not in our account. Chase the branch for it.
NEXT STEPour move
File the NOI on the IGR site
The challan is paid. The co-pilot fills the portal from the case; you check and submit.
Before opening the portal, the engine sees:
• payment NOT verified — office rule: no filing before credit
• PROPERTY NOT VERIFIED — open the case's Details & records, check the English boxes against the title document, save a correction if needed. e-filing makes this a government record.
• no challan GRN on the case — upload the paid challan first (its GRN fills the payment page)
• 1 property box(es) not from the Index II / derived / unsure — amber on the portal: attr2_value
• Build Up Area not on file — read it off the Index II / sale deed
• Loan Amount: no paid challan with a printed figure is on this case yet — the case's own 26,20,000 is typed; upload the paid challan and it takes over
How — one e-filing tab, the co-pilot fills
Press the button; switch to the e-filing tab you are already logged into — the next page there fills by itself. One e-filing tab only: the portal keeps one session per login. Not logged in yet today? open the portal. The co-pilot creates the token from the Date of Mortgage, opens each page and fills it, checked by EzDocs; you check, do photo and thumb, press each Save and the final submit. Then press Filed on IGR so the branch hears it. New to it? Rehearse on the practice copy.
Historywhat happened on this case, newest first
2 Oct9 things
cards read
The PAN and the Aadhaar name the same person — checked by the engine, no need to compare by hand
Co-applicant added
kyc address read
The PAN and the Aadhaar name the same person — checked by the engine, no need to compare by hand
The PAN and the Aadhaar name the same person — checked by the engine, no need to compare by hand
kyc address read
roles from letter
Co-applicant added
26 Sep1 thing — 1 step
index2 docno read
19 Sep2 things — 2 steps
Payment to our account found INSIDE a file (a statement / a receipt in a bundle) — recorded as the branch's payment proof; the bank credit still decides
screenshot claim recorded
15 Sep2 things — 2 steps
EzDocs read the whole trail as one conversation — where the case stands is on the page
kyc address read
14 Sep3 things — 3 steps
The branch's title document is on the case — the filing is the NOI team's move
property self check
property attrs split
7 Sep2 things — 2 steps
match reverted done case
match undone
4 Sep2 things — 2 steps
A waiting bank credit was matched to this case
A credit that had been waiting found its case.
Payment verified against the credit in our account
The challan can be made now — money is no longer the wait.
3 Sep2 things — 2 steps
extra challan scanned
Moved to 'challan paid' on the NOI team's own mail
The NOI team's own mail said the challan went — the case followed.
1 Sep4 things — 1 document received · 2 letters written · 1 step
Wrote the fee quote mail — held, silent mode
Required Challan And NOI.MR.SUNIL RAMDASH SANAP/ HOU/ KLN/0826/5193576
Property address read from the sanction letter
Received: Sanction letter
DocScanner Aug 27, 2026 11-14 AM.pdf
Case opened from the branch's mail
Older days stay folded — open one to read it. The mails themselves are in the thread above; Abhijit's technical record is under Details & records.
What the e-filing still needs1 still to come
6 of 7 in hand · the challan is done — these are for the filing / KYC
✓Sanction letteropen
✓Payment screenshot — shows ₹22,770; money not verified yet — inside DocScanner Aug 27, 2026 11-14 AM.popen
Property address — READ from the Index II, nothing missing. A person must confirm it: check the boxes and mark VERIFIED.
Mails & papers →every paper, beside its mail · 1 file
The whole file has not been read yet1 paper on file
Moneywaiting for the credit
₹22,800
Nothing has reached our account yet — only a credit our bank shows us counts.
Screenshot ₹22,770 — ₹30 under our ask, not below the real calculation ₹22,760. Counts as full. Nothing to ask.
why?
The branch paid the statutory-exact figure (our ₹10 round-ups are the buffer). Rule (boss, 4 Sep): everything above the real calculation — government + DHC ₹300 + our fee — up to our rounded-up ask is the NOI team's own buffer (the ₹10 round-ups, the ₹20 DHC margin), never a short payment; anything below the real calculation is short. The screenshot is still a claim: money counts only on the credit SMS or a person's Verify.
This payment is from the Vyapar QR (HDFC) at 2026-08-26 — the engine cannot hear this road. Please verify manually. Verify manually ↓
The working
Stamp duty 0.3%7,870
Registration fee 0.5%13,110
Government handling320
Our service fee1,500
Total we ask for22,800
By law ₹22,780. We ask ₹22,800 (rounded up to ₹10 — our rule).
why?
The NOI team's calculator rounds every percentage row UP to the next ₹10 with a ₹5 buffer, so a challan can never be a rupee short at the SRO counter. The exact figures stay recorded for the cross-check.
Propertynot verified yet
Unit 712, 7th Floor, Block Phase III B - Building No.2 - Bluebell, Project Davakhar Sereno Phase III & III B, SURVEY, 36, Advli Dhokali Kalyan, 421306
read from the Index II · e-filing boxes 38 of 58 ready
Check the property →the boxes beside the paper
People
Shweta Sunil Sanap · co-applicantPJGPS0614JSUNIL RAMDAS SANAP · applicantDWZPS1521QRamdas Nathu Sanap · co-applicantCSBPS7999H
rendered in 2.57 s · 217 queries · this page refreshes by itself when something on it changes (never while you type) · release v516 · build 20ef911f